FM 300 CAPITAL CAMPAIGN


 

FM 300 CAPITAL CAMPAIGN

FM 300 is a rare capital campaign being undertaken by Strong Tower Christian Media, WEEC and WFCJ for the purpose of raising additional funds for equipment upgrades that will enable us to be on the cutting edge of communications technology.  Our mission is to broadcast with excellence and integrity to lead the lost to Jesus Christ and the Christian into a closer walk with Him.

FM stands for Future Ministry and 300 represents our equipment need of $300,000.  A gift to the FM 300 capital campaign helps us to improve the vehicle, by which the Gospel message is delivered.  Friend, this is the most important message of all time!  Our equipment must be fully functional and of the highest quality to deliver the Gospel every day, both near and far.

Here on our website, we have pictures, prices and descriptions of the needed equipment (check the links at the bottom of this page).   If God prompts to you to be part of the Future Ministry 300 campaign at WFCJ, you can designate a onetime gift to help with the purchase of equipment.  Every donation that is marked for FM 300, will be used solely for that purpose and is tax deductible.  If you already support our ministry’s operations budget, we ask that you consider an FM 300 gift over and above your regular offerings. You may use your credit or debit card here to make a contribution:

Alternatively, you can send a check to:

WFCJ
PO Box 937
Dayton, Ohio 45449.

 If you have any questions about this campaign or how you can be a part of God’s provision for the eed, call Kevin Boggs (Strong Tower Christian Media – Director of Development) at 1-877-493-3236.

Thank you for helping us to equip both stations to operate with much greater efficiency and stewardship, which will in turn enhance our ability to share the greatest story ever told!

Digital Studio Upgrades

Digital Studio Upgrades

Digital Hybrid Transmitter

Digital Hybrid Transmitter

New Tower / Tower Network

New Tower / Tower Network

Studio Complex Power Transformer

Studio Complex Power Transformer

New Natural Gas Generator

New Natural Gas Generator

 

 

 

 

 

 

 

 

 

 

WORK COMPLETED SO FAR:

xenia

[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0547.jpg]41070
Buying the building for the new Strong Tower Headquarters. Left to right: Bud Schindler (Chairman of the Board), Tracy Figley (President/CEO), Jerry Dendinger (COO Athletes in Action)
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0911.jpg]17030
Brentwood Builders begins renovation
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0970.jpg]12630
Old laundry building removed next door
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0972.jpg]10190
New sidewalk to our lower level entrance
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0994.jpg]8700
Back-up generator set for our new home
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0509.jpg]7520
Front office area, November 2012
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0696.jpg]6930
Studs going up
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0978.jpg]6340
New windows and walls up
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0984.jpg]6070
New ceiling and paint
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0527.jpg]5600
Unfinished Lower Level
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0530.jpg]5300
Unfinished Lower Level
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0532.jpg]4960
Old Electrical Service
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0977.jpg]4750
New Electrical Service
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0949.jpg]4610
New Elevator Shaft
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0983.jpg]4510
Elevator Mechanism installed
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0931.jpg]4480
Wire runs for our New Digital Studios
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0967.jpg]4330
New Digital Equipment Room
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0673.jpg]4190
Studs going up in New Studio Complex
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0932.jpg]4210
Windows installed in New Studio Complex
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0987.jpg]4090
Hallway wrapping around New Studio Complex
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0989.jpg]4070
Large Meeting Room / Live Studio
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0518.jpg]3920
Unfinished Garage Area November 2012
[img src=http://wfcj.com/wp-content/flagallery/xenia/thumbs/thumbs_img_0991.jpg]3930
Refinished Garage Area August 2013